Skip to main content

Life-threatening emergency? Call Triple Zero (000). · SES flood and storm help: 132 500

Updated · Reload· Auto-refresh every 5 min· Theme: Auto · Light · Dark

Scheduled roadwork

Asphalt Works — Victoria Parade, Port Augusta

Victoria Parade Near Howard St, Port Augusta

Map of Asphalt Works — Victoria Parade, Port Augusta and nearby items

Map preview · about 20 KB · © OpenStreetMap

Type: Roadworks

Work: Asphalt Works

Location: Victoria Parade near Howard St, Port Augusta

Direction: Both Directions

Lanes: Two lanes closed

Speed limit: 40 km/h

Starts: 2 Oct 2025, 6:30 pm ACST

Ends: 1 Nov 2026, 2:30 am ACDT

Job number: 2109900

Location
-32.4999, 137.7782
Source
Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution

OpenStreetMap Open on the full interactive mapSouth Australia warnings

Nearby

  1. Scheduled roadwork158 m away

    Asphalt Works — Victoria Parade, Port Augusta

    Details

  2. Scheduled roadwork823 m away

    Asphalt Works — Victoria Parade, Port Augusta

    Details

  3. Scheduled roadwork1.8 km away

    Traffic Management — Victoria Parade, Port Augusta

    Details

  4. Scheduled roadwork1.9 km away

    Maintenance — Eyre Highway, Port Augusta

    Details

  5. Scheduled roadwork2.4 km away

    Asphalt Works — Augusta Highway, Port Augusta

    Details

  6. Scheduled roadwork2.4 km away

    Line Marking & Painting — Augusta Highway, Port Augusta

    Details

  7. Scheduled roadwork2.6 km away

    Maintenance — Eyre Highway, Port Augusta West

    Details

  8. Scheduled roadwork2.6 km away

    Kerbing Installation — Augusta Highway, Port Augusta

    Details

  9. Scheduled roadwork2.6 km away

    Kerbing Installation — Augusta Highway, Port Augusta

    Details

  10. Scheduled roadwork2.7 km away

    Asphalt Works — Augusta Highway, Port Augusta

    Details