Scheduled roadwork
Mowing — Port Wakefield Road, Cavan
Port Wakefield Road Near Thomas St, Cavan

Map preview · about 20 KB · © OpenStreetMap
Roads · Power outages
Type: Roadworks
Work: Mowing
Location: Port Wakefield Road near Thomas St, Cavan
Direction: Both Directions
Lanes: One lane closed
Speed limit: 40 km/h
Starts: 18 Aug 2026, 4:30 am ACST
Ends: 19 Nov 2026, 4:30 pm ACDT
Job number: 2122742
- Location
- -34.8291, 138.5988
- Source
- Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution
OpenStreetMap Open on the full interactive mapSouth Australia warnings
Nearby
Scheduled roadwork158 m away
Scheduled roadwork158 m away
Scheduled roadwork181 m away
Scheduled roadwork181 m away
Scheduled roadwork200 m away
Scheduled roadwork302 m away
Scheduled roadwork510 m away
Scheduled roadwork707 m away
Scheduled roadwork707 m away
Scheduled roadwork707 m away