Skip to main content

Life-threatening emergency? Call Triple Zero (000). · SES flood and storm help: 132 500

Updated · Reload· Auto-refresh every 5 min· Theme: Auto · Light · Dark

Scheduled roadwork

Bitumen — Port Wakefield Highway, Korunye

Port Wakefield Highway Near Porter Rd, Korunye

Map of Bitumen — Port Wakefield Highway, Korunye and nearby items

Map preview · about 20 KB · © OpenStreetMap

Type: 24hr Roadworks

Work: Bitumen

Location: Port Wakefield Highway near Porter Rd, Korunye

Direction: Both Directions

Lanes: One lane closed

Speed limit: 40 km/h

Starts: 28 Feb 2026, 5:30 pm ACDT

Ends: 17 Nov 2026, 4:30 am ACDT

Job number: 2135963

Location
-34.5685, 138.4795
Source
Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution

OpenStreetMap Open on the full interactive mapSouth Australia warnings

Nearby

  1. Scheduled roadwork0 m away

    Mowing — Port Wakefield Highway, Lower Light

    Details

  2. Scheduled roadwork0 m away

    Bridge — Port Wakefield Highway, Korunye

    Details

  3. Scheduled roadwork0 m away

    Bridge — Port Wakefield Highway, Lower Light

    Details

  4. Scheduled roadwork0 m away

    Mowing — Port Wakefield Highway, Korunye

    Details

  5. Scheduled roadwork428 m away

    Boring (Directional) — Port Wakefield Highway, Middle Beach

    Details

  6. Scheduled roadwork428 m away

    Bridge — Port Wakefield Highway, Lower Light

    Details

  7. Scheduled roadwork428 m away

    Bridge — Port Wakefield Highway, Lower Light

    Details

  8. Scheduled roadwork989 m away

    Bitumen — Port Wakefield Highway, Lower Light

    Details

  9. Scheduled roadwork989 m away

    Road Repair — Port Wakefield Highway, Lower Light

    Details

  10. Scheduled roadwork989 m away

    Bridge — Port Wakefield Highway, Korunye

    Details