Scheduled roadwork
Spray Sealing/ Asphalt Works — St Vincent Highway, Edithburgh
St Vincent Highway Near Wilkey Rd, Edithburgh

Map preview · about 20 KB · © OpenStreetMap
Type: 24hr Roadworks
Work: Spray Sealing/ Asphalt Works
Location: St Vincent Highway near Wilkey Rd, Edithburgh
Direction: Both Directions
Lanes: Shuttle Flow
Speed limit: 60 km/h
Starts: 16 Mar 2026, 4:30 pm ACDT
Ends: 1 Dec 2026, 4:30 am ACDT
Job number: 2139322
- Location
- -35.0780, 137.7277
- Source
- Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution
OpenStreetMap Open on the full interactive mapSouth Australia warnings
Nearby
Scheduled roadwork642 m away
Spray Sealing/ Asphalt Works — St Vincent Highway, Edithburgh
Scheduled roadwork713 m away
Spray Sealing/ Asphalt Works — St Vincent Highway, Edithburgh
Scheduled roadwork1.2 km away
Scheduled roadwork1.7 km away
Scheduled roadwork2.2 km away
Spray Sealing/ Asphalt Works — St Vincent Highway, Edithburgh
Scheduled roadwork3.7 km away
Spray Sealing/ Asphalt Works — St Vincent Highway, Edithburgh
Scheduled roadwork7.2 km away
Scheduled roadwork7.5 km away
Scheduled roadwork8.1 km away
Planned outage8.6 km away