Skip to main content

Life-threatening emergency? Call Triple Zero (000). · SES flood and storm help: 132 500

Updated · Reload· Auto-refresh every 5 min· Theme: Auto · Light · Dark

Scheduled roadwork

Kerbing Installation — Port Wakefield Road, Gepps Cross

Port Wakefield Road Near White Rd, Gepps Cross

Map of Kerbing Installation — Port Wakefield Road, Gepps Cross and nearby items

Map preview · about 20 KB · © OpenStreetMap

Type: 24hr Roadworks

Work: Kerbing Installation

Location: Port Wakefield Road near White Rd, Gepps Cross

Direction: Both Directions

Lanes: One lane closed

Speed limit: 40 km/h

Starts: 20 May 2026, 6:30 pm ACST

Ends: 31 Oct 2026, 1:30 am ACDT

Job number: 2151596

Location
-34.8416, 138.5997
Source
Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution

OpenStreetMap Open on the full interactive mapSouth Australia warnings

Nearby

  1. Scheduled roadwork0 m away

    Mowing — Port Wakefield Road, Gepps Cross

    Details

  2. Scheduled roadwork0 m away

    Kerbing Installation — Port Wakefield Road, Gepps Cross

    Details

  3. Scheduled roadwork0 m away

    Detours — Port Wakefield Road, Gepps Cross

    Details

  4. Scheduled roadwork0 m away

    Asphalt Works — Port Wakefield Road, Gepps Cross

    Details

  5. Scheduled roadwork296 m away

    Mowing — Port Wakefield Road, Gepps Cross

    Details

  6. Scheduled roadwork296 m away

    Kerbing Installation — Port Wakefield Road, Gepps Cross

    Details

  7. Scheduled roadwork296 m away

    Detours — Port Wakefield Road, Gepps Cross

    Details

  8. Scheduled roadwork473 m away

    Mowing — Cavan Road, Gepps Cross

    Details

  9. Scheduled roadwork499 m away

    Mowing — Cavan Road, Dry Creek

    Details

  10. Scheduled roadwork499 m away

    Mowing — Cavan Road, Dry Creek

    Details