Scheduled roadwork
Asphalt Works — Murray Street, Tanunda
Murray Street Near Basedow Rd, Tanunda

Map preview · about 20 KB · © OpenStreetMap
Type: Roadworks
Work: Asphalt Works
Location: Murray Street near Basedow Rd, Tanunda
Direction: Both Directions
Lanes: Lateral Shift
Speed limit: 40 km/h
Starts: 27 Aug 2026, 6:30 pm ACST
Ends: 1 Nov 2026, 2:30 am ACDT
Job number: 2167654
- Location
- -34.5240, 138.9602
- Source
- Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution
OpenStreetMap Open on the full interactive mapSouth Australia warnings
Nearby
Scheduled roadwork0 m away
Scheduled roadwork69 m away
Scheduled roadwork281 m away
Scheduled roadwork386 m away
Scheduled roadwork386 m away
Scheduled roadwork641 m away
Scheduled roadwork881 m away
Scheduled roadwork881 m away
Scheduled roadwork1.3 km away
Scheduled roadwork1.3 km away