Skip to main content

Life-threatening emergency? Call Triple Zero (000). · SES flood and storm help: 132 500

Updated · Reload· Auto-refresh every 5 min· Theme: Auto · Light · Dark

Scheduled roadwork

Sewer Connection — Hancock Road, Banksia Park

Hancock Road Near Nowra St, Banksia Park

Map of Sewer Connection — Hancock Road, Banksia Park and nearby items

Map preview · about 20 KB · © OpenStreetMap

Roads · Power outages

Type: 24hr Roadworks

Work: Sewer Connection

Location: Hancock Road near Nowra St, Banksia Park

Direction: South Bound

Lanes: Closure

Speed limit: 40 km/h

Starts: 11 Sep 2026, 5:30 am ACST

Ends: 30 Nov 2026, 4:30 pm ACDT

Job number: 2168722

Location
-34.8095, 138.7179
Source
Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution

OpenStreetMap Open on the full interactive mapSouth Australia warnings

Nearby

  1. Scheduled roadwork0 m away

    Sewer Connection — Hancock Road, Redwood Park

    Details

  2. Scheduled roadwork0 m away

    Sewer Connection — Hancock Road, Banksia Park

    Details

  3. Scheduled roadwork0 m away

    Sewer Connection — Hancock Road, Redwood Park

    Details

  4. Scheduled roadwork89 m away

    Sewer Connection — Hancock Road, Redwood Park

    Details

  5. Planned outage187 m away

    Planned Power Outage — Banksia Park

    Details

  6. Scheduled roadwork188 m away

    Sewer Connection — Hancock Road, Redwood Park

    Details

  7. Scheduled roadwork209 m away

    Sewer Connection — Hancock Road, Banksia Park

    Details

  8. Scheduled roadwork319 m away

    Sewer Connection — Hancock Road, Redwood Park

    Details

  9. Scheduled roadwork319 m away

    Sewer Connection — Hancock Road, Redwood Park

    Details

  10. Scheduled roadwork434 m away

    Miscellaneous Works — Hancock Road, Fairview Park

    Details