Skip to main content

Life-threatening emergency? Call Triple Zero (000). · SES flood and storm help: 132 500

Updated · Reload· Auto-refresh every 5 min· Theme: Auto · Light · Dark

Scheduled roadwork

Bitumen — Victor Harbor Road, Willunga

Victor Harbor Road Near St Andrews Tce, Willunga

Map of Bitumen — Victor Harbor Road, Willunga and nearby items

Map preview · about 20 KB · © OpenStreetMap

Type: 24hr Roadworks

Work: Bitumen

Location: Victor Harbor Road near St Andrews Tce, Willunga

Direction: Both Directions

Lanes: Shuttle Flow

Speed limit: 40 km/h

Starts: 18 Sep 2026, 7:00 pm ACST

Ends: 17 Nov 2026, 2:30 am ACDT

Job number: 2169253

Location
-35.2789, 138.5548
Source
Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution

OpenStreetMap Open on the full interactive mapSouth Australia warnings

Nearby

  1. Scheduled roadwork1.2 km away

    Kerbing And Footpath Installation — Aldinga Road, Willunga

    Details

  2. Scheduled roadwork1.2 km away

    Kerbing And Footpath Installation — Aldinga Road, Willunga

    Details

  3. Scheduled roadwork1.9 km away

    Asphalt Works — Aldinga Road, Whites Valley

    Details

  4. Scheduled roadwork1.9 km away

    Asphalt Works — Aldinga Road, Whites Valley

    Details

  5. Scheduled roadwork2.0 km away

    Landscaping / Irrigation — Main Road, Willunga

    Details

  6. Scheduled roadwork2.8 km away

    Bitumen — Victor Harbor Road, Willunga South

    Details

  7. Scheduled roadwork3.1 km away

    Landscaping / Irrigation — Main Road, Mclaren Vale

    Details

  8. Scheduled roadwork3.2 km away

    Bitumen — Victor Harbor Road, Willunga Hill

    Details

  9. Scheduled roadwork4.3 km away

    Bitumen — Victor Harbor Road, Willunga Hill

    Details

  10. Scheduled roadwork4.3 km away

    Landscaping / Irrigation — Main Road, Mclaren Vale

    Details