Scheduled roadwork
Asphalt Works — Gorge Road, Paradise
Gorge Road Near Berry Av, Paradise

Map preview · about 20 KB · © OpenStreetMap
Type: Roadworks
Work: Asphalt Works
Location: Gorge Road near Berry Av, Paradise
Direction: Both Directions
Lanes: Lateral Shift
Speed limit: 40 km/h
Starts: 14 Sep 2026, 7:30 pm ACST
Ends: 1 Dec 2026, 1:30 am ACDT
Job number: 2169575
- Location
- -34.8759, 138.6857
- Source
- Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution
OpenStreetMap Open on the full interactive mapSouth Australia warnings
Nearby
Scheduled roadwork0 m away
Scheduled roadwork0 m away
Scheduled roadwork0 m away
Scheduled roadwork210 m away
Scheduled roadwork334 m away
Scheduled roadwork394 m away
Scheduled roadwork543 m away
Scheduled roadwork741 m away
Scheduled roadwork861 m away
Scheduled roadwork861 m away