Scheduled roadwork
Tree Pruning — Lobethal Road, Basket Range
Lobethal Road Near 7a Trk, Basket Range

Map preview · about 20 KB · © OpenStreetMap
Type: Roadworks
Work: Tree Pruning
Location: Lobethal Road near 7a Trk, Basket Range
Direction: Both Directions
Lanes: Shuttle Flow
Speed limit: 40 km/h
Starts: 27 Sep 2026, 5:30 pm ACST
Ends: 7 Nov 2026, 3:00 am ACDT
Job number: 2169740
- Location
- -34.9422, 138.7749
- Source
- Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution
OpenStreetMap Open on the full interactive mapSouth Australia warnings
Nearby
Burn off90 m away
Scheduled roadwork193 m away
Scheduled roadwork193 m away
Scheduled roadwork193 m away
Scheduled roadwork574 m away
Scheduled roadwork574 m away
Scheduled roadwork574 m away
Scheduled roadwork733 m away
Scheduled roadwork733 m away
Scheduled roadwork733 m away