Skip to main content

Life-threatening emergency? Call Triple Zero (000). · SES flood and storm help: 132 500

Updated · Reload· Auto-refresh every 5 min· Theme: Auto · Light · Dark

Scheduled roadwork

Asphalt Works — Gomersal Road, Tanunda

Gomersal Road Near Murray St, Tanunda

Map of Asphalt Works — Gomersal Road, Tanunda and nearby items

Map preview · about 20 KB · © OpenStreetMap

Type: 24hr Roadworks

Work: Asphalt Works

Location: Gomersal Road near Murray St, Tanunda

Direction: Both Directions

Lanes: Shuttle Flow

Speed limit: 40 km/h

Starts: 14 Sep 2026, 5:30 pm ACST

Ends: 17 Nov 2026, 2:30 am ACDT

Job number: 2169847

Location
-34.5317, 138.9490
Source
Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution

OpenStreetMap Open on the full interactive mapSouth Australia warnings

Nearby

  1. Scheduled roadwork208 m away

    Road Reconstruction — Barossa Valley Way, Tanunda

    Details

  2. Scheduled roadwork952 m away

    Aerial Cabling — Murray Street, Tanunda

    Details

  3. Scheduled roadwork1.1 km away

    Footpath Maintenance/Repairs — Murray Street, Tanunda

    Details

  4. Scheduled roadwork1.3 km away

    Asphalt Works — Murray Street, Tanunda

    Details

  5. Scheduled roadwork1.3 km away

    Asphalt Works — Murray Street, Tanunda

    Details

  6. Scheduled roadwork1.4 km away

    Asphalt Works — Gomersal Road, Tanunda

    Details

  7. Scheduled roadwork1.4 km away

    Asphalt Works — Murray Street, Tanunda

    Details

  8. Scheduled roadwork2.0 km away

    Asphalt Works — Gomersal Road, Tanunda

    Details

  9. Scheduled roadwork2.0 km away

    Asphalt Works — Murray Street, Tanunda

    Details

  10. Scheduled roadwork2.2 km away

    Asphalt Works — Murray Street, Tanunda

    Details