Scheduled roadwork
Survey — Main South Road, Maslin Beach
Main South Road Near Tatachilla Rd, Maslin Beach

Map preview · about 20 KB · © OpenStreetMap
Type: Roadworks
Work: Survey
Location: Main South Road near Tatachilla Rd, Maslin Beach
Direction: Both Directions
Lanes: One lane closed
Speed limit: 40 km/h
Starts: 22 Sep 2026, 4:30 am ACST
Ends: 30 Nov 2026, 3:30 pm ACDT
Job number: 2170071
- Location
- -35.2221, 138.4924
- Source
- Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution
OpenStreetMap Open on the full interactive mapSouth Australia warnings
Nearby
Scheduled roadwork0 m away
Fleurieu Connection Alliance - Landscaping — Main South Road, Maslin Beach
Scheduled roadwork0 m away
Fleurieu Connection Alliance - Landscaping — Main South Road, Maslin Beach
Scheduled roadwork0 m away
Scheduled roadwork0 m away
Scheduled roadwork0 m away
Scheduled roadwork0 m away
Scheduled roadwork5 m away
Scheduled roadwork5 m away
Scheduled roadwork15 m away
Scheduled roadwork15 m away
Spray Sealing/ Asphalt Works — Tatachilla Road, Mclaren Vale