Scheduled roadwork
Kerbing And Footpath Installation — Park Terrace, Brahma Lodge
Park Terrace Near Fenden Rd, Brahma Lodge

Map preview · about 20 KB · © OpenStreetMap
Type: Roadworks
Work: Kerbing And Footpath Installation
Location: Park Terrace near Fenden Rd, Brahma Lodge
Direction: South East Bound
Lanes: One lane closed
Speed limit: 40 km/h
Starts: 30 Sep 2026, 6:30 pm ACST
Ends: 4 Nov 2026, 12:00 am ACDT
Job number: 2171407
- Location
- -34.7686, 138.6518
- Source
- Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution
OpenStreetMap Open on the full interactive mapSouth Australia warnings
Nearby
Scheduled roadwork0 m away
Scheduled roadwork1.0 km away
Scheduled roadwork1.0 km away
Scheduled roadwork1.0 km away
Scheduled roadwork1.0 km away
Scheduled roadwork1.1 km away
Scheduled roadwork1.1 km away
Scheduled roadwork1.2 km away
Scheduled roadwork1.2 km away
Scheduled roadwork1.2 km away