Skip to main content

Life-threatening emergency? Call Triple Zero (000). · SES flood and storm help: 132 500

Updated · Reload· Auto-refresh every 5 min· Theme: Auto · Light · Dark

Scheduled roadwork

Asphalt Works — Cross Road, Myrtle Bank

Cross Road Near Spence Av, Myrtle Bank

Map of Asphalt Works — Cross Road, Myrtle Bank and nearby items

Map preview · about 20 KB · © OpenStreetMap

Roads · Power outages

Type: 24hr Roadworks

Work: Asphalt Works

Location: Cross Road near Spence Av, Myrtle Bank

Direction: Both Directions

Lanes: Contraflow

Speed limit: 40 km/h

Starts: 2 Nov 2026, 5:30 am ACDT

Ends: 2 Nov 2026, 4:30 pm ACDT

Job number: 2171419

Location
-34.9638, 138.6409
Source
Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution

OpenStreetMap Open on the full interactive mapSouth Australia warnings

Nearby

  1. Scheduled roadwork49 m away

    Tree Pruning — Cross Road, Myrtle Bank

    Details

  2. Scheduled roadwork166 m away

    Tree Pruning — Cross Road, Urrbrae

    Details

  3. Scheduled roadwork270 m away

    Vms Trailer — Glen Osmond Road, Myrtle Bank

    Details

  4. Scheduled roadwork285 m away

    Asphalt Works — Mount Barker Road, Myrtle Bank

    Details

  5. Scheduled roadwork285 m away

    Asphalt Works — Mount Barker Road, Myrtle Bank

    Details

  6. Scheduled roadwork285 m away

    Vms Trailer — Mount Barker Road, Urrbrae

    Details

  7. Scheduled roadwork339 m away

    Asphalt Works — Portrush Road, Glen Osmond

    Details

  8. Scheduled roadwork402 m away

    Asphalt Works — Portrush Road, Glen Osmond

    Details

  9. Scheduled roadwork402 m away

    Asphalt Works — Portrush Road, Glen Osmond

    Details

  10. Scheduled roadwork402 m away

    Asphalt Works — Portrush Road, Glen Osmond

    Details