Scheduled roadwork
Survey — Hancock Road, Vista
Hancock Road Near Walsh St, Vista

Map preview · about 20 KB · © OpenStreetMap
Type: Roadworks
Work: Survey
Location: Hancock Road near Walsh St, Vista
Direction: Both Directions
Lanes: Shuttle Flow
Speed limit: 40 km/h
Starts: 12 Oct 2026, 8:30 pm ACDT
Ends: 8 Nov 2026, 1:30 am ACDT
Job number: 2172102
- Location
- -34.8322, 138.7196
- Source
- Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution
OpenStreetMap Open on the full interactive mapSouth Australia warnings
Nearby
Scheduled roadwork0 m away
Scheduled roadwork0 m away
Scheduled roadwork59 m away
Scheduled roadwork267 m away
Scheduled roadwork267 m away
Scheduled roadwork267 m away
Scheduled roadwork291 m away
Scheduled roadwork503 m away
Scheduled roadwork592 m away
Scheduled roadwork819 m away