Skip to main content

Life-threatening emergency? Call Triple Zero (000). · SES flood and storm help: 132 500

Updated · Reload· Auto-refresh every 5 min· Theme: Auto · Light · Dark

Scheduled roadwork

Asphalt Works — Hallett Street, Tarlee

Hallett Street Near Craig St, Tarlee

Map of Asphalt Works — Hallett Street, Tarlee and nearby items

Map preview · about 20 KB · © OpenStreetMap

Type: 24hr Roadworks

Work: Asphalt Works

Location: Hallett Street near Craig St, Tarlee

Direction: Both Directions

Lanes: Shuttle Flow

Speed limit: 40 km/h

Starts: 13 Oct 2026, 5:30 pm ACDT

Ends: 17 Nov 2026, 2:30 am ACDT

Job number: 2172214

Location
-34.2719, 138.7722
Source
Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution

OpenStreetMap Open on the full interactive mapSouth Australia warnings

Nearby

  1. Scheduled roadwork312 m away

    Asphalt Works — Horrocks Highway, Tarlee

    Details

  2. Scheduled roadwork798 m away

    Road Reconstruction — Horrocks Highway, Tarlee

    Details

  3. Scheduled roadwork1.2 km away

    Road Reconstruction — Horrocks Highway, Tarlee

    Details

  4. Planned outage2.9 km away

    Planned Power Outage — Alma And Surrounds

    Details

  5. Scheduled roadwork3.1 km away

    Road Reconstruction — Horrocks Highway, Tarlee

    Details

  6. Scheduled roadwork4.9 km away

    Road Reconstruction — Horrocks Highway, Giles Corner

    Details

  7. Scheduled roadwork6.7 km away

    Asphalt Works — Barrier Highway, Riverton

    Details

  8. Scheduled roadwork6.7 km away

    Road Reconstruction — Horrocks Highway, Giles Corner

    Details

  9. Scheduled roadwork8.2 km away

    Sign Installation — Tarlee Road, Kapunda

    Details

  10. Scheduled roadwork9.6 km away

    Asphalt Works — Barrier Highway, Riverton

    Details