Skip to main content

Life-threatening emergency? Call Triple Zero (000). · SES flood and storm help: 132 500

Updated · Reload· Auto-refresh every 5 min· Theme: Auto · Light · Dark

Scheduled roadwork

Footpath Maintenance/Repairs — Murray Street, Tanunda

Murray Street Near Young St, Tanunda

Map of Footpath Maintenance/Repairs — Murray Street, Tanunda and nearby items

Map preview · about 20 KB · © OpenStreetMap

Type: 24hr Roadworks

Work: Footpath Maintenance/Repairs

Location: Murray Street near Young St, Tanunda

Direction: Both Directions

Lanes: No lanes closed

Speed limit: 40 km/h

Starts: 26 Oct 2026, 7:30 pm ACDT

Ends: 10 Nov 2026, 2:30 am ACDT

Job number: 2172968

Location
-34.5258, 138.9580
Source
Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution

OpenStreetMap Open on the full interactive mapSouth Australia warnings

Nearby

  1. Scheduled roadwork105 m away

    Aerial Cabling — Murray Street, Tanunda

    Details

  2. Scheduled roadwork105 m away

    Powerline Work — Murray Street, Tanunda

    Details

  3. Scheduled roadwork281 m away

    Asphalt Works — Murray Street, Tanunda

    Details

  4. Scheduled roadwork281 m away

    Asphalt Works — Murray Street, Tanunda

    Details

  5. Scheduled roadwork350 m away

    Asphalt Works — Murray Street, Tanunda

    Details

  6. Scheduled roadwork922 m away

    Asphalt Works — Murray Street, Tanunda

    Details

  7. Scheduled roadwork983 m away

    Road Reconstruction — Barossa Valley Way, Tanunda

    Details

  8. Scheduled roadwork1.1 km away

    Asphalt Works — Gomersal Road, Tanunda

    Details

  9. Scheduled roadwork1.2 km away

    Asphalt Works — Murray Street, Tanunda

    Details

  10. Scheduled roadwork1.2 km away

    Asphalt Works — Murray Street, Tanunda

    Details