Scheduled roadwork
Adelaide 500 - Track Circuit Infrastructure — Fullarton Road Exit To Wakefield Street, Adelaide
Fullarton Road Exit To Wakefield Street Near Fullarton Rd, Adelaide

Map preview · about 20 KB · © OpenStreetMap
Roads · Power outages
Type: Roadworks
Work: Adelaide 500 - Track Circuit Infrastructure
Location: Fullarton Road Exit To Wakefield Street near Fullarton Rd, Adelaide
Direction: Both Directions
Lanes: One lane closed
Speed limit: 40 km/h
Starts: 12 Nov 2026, 7:30 pm ACDT
Ends: 14 Nov 2026, 2:30 am ACDT
Job number: 2173020
- Location
- -34.9285, 138.6236
- Source
- Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution
OpenStreetMap Open on the full interactive mapSouth Australia warnings
Nearby
Scheduled roadwork96 m away
Scheduled roadwork107 m away
Scheduled roadwork141 m away
Scheduled roadwork158 m away
Traffic Management — Fullarton Road Exit To Wakefield Street, Adelaide
Scheduled roadwork165 m away
Scheduled roadwork165 m away
Scheduled roadwork231 m away
Scheduled roadwork263 m away
Scheduled roadwork333 m away
Scheduled roadwork374 m away