Scheduled roadwork
Sign Installation — Murray Street, Tanunda
Murray Street Near Basedow Rd, Tanunda

Map preview · about 20 KB · © OpenStreetMap
Roads · Power outages
Type: Roadworks
Work: Sign Installation
Location: Murray Street near Basedow Rd, Tanunda
Direction: Both Directions
Lanes: Shuttle Flow
Speed limit: 40 km/h
Starts: 30 Oct 2026, 7:30 pm ACDT
Ends: 14 Nov 2026, 1:00 am ACDT
Job number: 2173464
- Location
- -34.5240, 138.9602
- Source
- Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution
OpenStreetMap Open on the full interactive mapSouth Australia warnings
Nearby
Scheduled roadwork0 m away
Scheduled roadwork0 m away
Scheduled roadwork69 m away
Scheduled roadwork281 m away
Scheduled roadwork386 m away
Scheduled roadwork641 m away
Scheduled roadwork881 m away
Scheduled roadwork881 m away
Planned outage1.2 km away
Scheduled roadwork1.3 km away