Scheduled roadwork
Asphalt Works — Greenhill Road, Summertown
Greenhill Road Near Hollidays Rd, Summertown

Map preview · about 20 KB · © OpenStreetMap
Roads · Power outages
Type: Roadworks
Work: Asphalt Works
Location: Greenhill Road near Hollidays Rd, Summertown
Direction: Both Directions
Lanes: Shuttle Flow
Speed limit: 40 km/h
Starts: 2 Nov 2026, 7:30 pm ACDT
Ends: 17 Nov 2026, 2:30 am ACDT
Job number: 2173468
- Location
- -34.9588, 138.7287
- Source
- Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution
OpenStreetMap Open on the full interactive mapSouth Australia warnings
Nearby
Scheduled roadwork265 m away
Scheduled roadwork511 m away
Scheduled roadwork556 m away
Scheduled roadwork730 m away
Scheduled roadwork740 m away
Scheduled roadwork1.0 km away
Scheduled roadwork1.2 km away
Scheduled roadwork1.3 km away
Tdu - Asset Repair Works — Mount Lofty Summit Road, Greenhill
Scheduled roadwork1.3 km away
Scheduled roadwork1.4 km away