Scheduled roadwork
Asphalt Works — Greenhill Road, Balhannah
Greenhill Road Near Woodcock Rd, Balhannah

Map preview · about 20 KB · © OpenStreetMap
Type: Roadworks
Work: Asphalt Works
Location: Greenhill Road near Woodcock Rd, Balhannah
Direction: Both Directions
Lanes: Shuttle Flow
Speed limit: 40 km/h
Starts: 2 Nov 2026, 8:30 pm ACDT
Ends: 17 Nov 2026, 1:30 am ACDT
Job number: 2173468
- Location
- -34.9886, 138.8164
- Source
- Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution
OpenStreetMap Open on the full interactive mapSouth Australia warnings
Nearby
Scheduled roadwork438 m away
Scheduled roadwork444 m away
Scheduled roadwork718 m away
Scheduled roadwork907 m away
Scheduled roadwork1.0 km away
Scheduled roadwork1.1 km away
Scheduled roadwork1.2 km away
Scheduled roadwork1.9 km away
Scheduled roadwork2.2 km away
Telecommunications Network Connections — Onkaparinga Valley Road, Oakbank
Scheduled roadwork3.0 km away