Planned outage
Planned Power Outage — Lewiston And Surrounds
Lewiston, Reeves Plains

Map preview · about 20 KB · © OpenStreetMap
Power outages · Roads
Scheduled
26 customers affected
Starts: 4 Nov, 9:00 pm ACDT
Ends: 5 Nov, 5:00 am ACDT
Reason: Maintaining and upgrading the electricity network
Suburbs: Lewiston (5501), Reeves Plains (5502)
Job: 184966
- Location
- -34.5848, 138.5917
- Source
- Data © SA Power Networks. For current outage information refer to the SA Power Networks outage map.
OpenStreetMap Open on the full interactive mapSouth Australia warnings
Nearby
Unplanned outage501 m away
Scheduled roadwork717 m away
Scheduled roadwork1.3 km away
Planned outage1.4 km away
Planned outage6.4 km away
Planned outage6.4 km away
Scheduled roadwork6.5 km away
Planned outage6.8 km away
Scheduled roadwork6.9 km away
Scheduled roadwork7.1 km away