Planned outage
Planned Power Outage — Geranium And Surrounds
Geranium, Lameroo, Marama, Parrakie

Map preview · about 20 KB · © OpenStreetMap
Power outages · Fire
Scheduled
74 customers affected
Starts: 10 Nov, 9:00 am ACDT
Ends: 10 Nov, 1:00 pm ACDT
Reason: Maintaining and upgrading the electricity network
Suburbs: Geranium (5301), Lameroo (5302), Marama (5307), Parrakie (5301)
Job: 187916
- Location
- -35.2435, 140.2701
- Source
- Data © SA Power Networks. For current outage information refer to the SA Power Networks outage map.
OpenStreetMap Open on the full interactive mapSouth Australia warnings
Nearby
Planned outage7.4 km away