Scheduled roadwork
Scheduled Roadwork Bridge Work — Tenandra Road, Wantabadgery
Tenandra Road Between River Road And Old Hume Hwy, Wantabadgery

Map preview · about 20 KB · © OpenStreetMap
Published · Updated (27 days ago)
A single lane side track is in place around the roadworks with portable traffic lights deployed to control traffic flow.
Reduced speed limits are in place during the works for the safety of road users and the construction team.
Motorists are advised to allow approximately 5 minutes of additional travel time.
The works are expected to be complete in December 2026, weather permitting.
Traffic arrangements:
Information for heavy vehicle operators:
All vehicles over 3.5m wide will need to contact traffic control by the UHF channel displayed on approach.
- Location
- -35.0782, 147.8214
- Source
- Data © Transport for NSW (Live Traffic NSW).
OpenStreetMap Open on the full interactive mapNew South Wales warnings
Nearby
Scheduled roadwork69 m away
Scheduled Roadwork Bridge Work — Tenandra Road, Wantabadgery