Scheduled roadwork
Scheduled Roadwork Bridge Work — Grosvenor Crescent, Summer Hill
Grosvenor Crescent Between Dover Street And Longport Street, Summer Hill

Map preview · about 20 KB · © OpenStreetMap
Roads · Power outages
Published · Updated (7 hr ago)
Temporary full road closure of Grosvenor Crescent, between Dover Street and Carlton Crescent / Longport Street, Summer Hill 21:00pm Monday 2 November 2026 to 4:00am Tuesday 3 November 2026 (with a contingency period of 4 weeks) for essential rail underbridge works associated with Sydney Trains track maintenance.
Appropriate traffic control is to be carried out to detour motorists via alternate routes. The Traffic Guidance Scheme (TGS) and Detour Plan are shown below. Ends of the road closure are manned to allow resident access where required. Heavy vehicles will use local streets to access the rail corridor. Parking will be limited to near access gates.
- Location
- -33.8917, 151.1429
- Source
- Data © Transport for NSW (Live Traffic NSW).
OpenStreetMap Open on the full interactive mapNew South Wales warnings
Nearby
Planned outage177 m away
Scheduled roadwork311 m away
Scheduled Roadwork Utilities — Old Canterbury Road, Lewisham
Planned outage421 m away
Special event567 m away
Planned outage662 m away
Traffic camera729 m away
Planned outage735 m away
Planned outage762 m away
Planned outage767 m away
Planned outage808 m away