Scheduled roadwork
Scheduled Roadwork New Richmond Bridge Upgrade (The Driftway) Stage 1 — Blacktown Road, South Windsor
Blacktown Road Between The Driftway And Racecourse Road, South Windsor

Map preview · about 20 KB · © OpenStreetMap
Roads · Power outages
Published · Updated (3 days ago)
From 7pm Mon 26 Oct the existing alignment of The Driftway between Reynolds Rd and Blacktown Rd will be closed for five months. Eastbound access to Blacktown Road will be detoured via Carrington Rd.
From 7pm Mon 26 Oct westbound traffic from Blacktown Rd will be switched to the new bridge alignment of The Driftway. No eastbound access will be permitted. This arrangement will be in place for five months. Local access to The Driftway between Luxford Rd and Reynolds Rd will be maintained. Right turn access to The Driftway from Blacktown Road southbound will be detoured via the George St roundabout to face Blacktown Rd northbound before turning left onto the new bridge alignment of The Driftway.
From 7pm Tue 27 Oct to 4am Wed 28 Oct, Racecourse Rd will be closed at Blacktown Rd with traffic detoured via George St and Hawkesbury Valley Way.
- Location
- -33.6336, 150.7790
- Source
- Data © Transport for NSW (Live Traffic NSW).
OpenStreetMap Open on the full interactive mapNew South Wales warnings
Nearby
Planned outage1.0 km away
Hazard3.2 km away
Scheduled roadwork3.3 km away
Scheduled Roadwork Bridge Work — Macquarie Street, South Windsor
Monitoring station3.5 km away
Planned outage3.9 km away
Planned outage4.1 km away
Scheduled roadwork4.2 km away
Scheduled Roadwork Intersection Upgrade — Lennox Street, Richmond
Scheduled roadwork4.7 km away
Scheduled Roadwork New Richmond Bridge Upgrade (The Driftway) Stage 1 — The Driftway, Richmond
Planned outage4.9 km away
Planned outage4.9 km away