Skip to main content

Life-threatening emergency? Call Triple Zero (000). · SES flood and storm help: 132 500

Updated · Reload· Auto-refresh every 5 min· Theme: Auto · Light · Dark

Scheduled roadwork · Pending

Eastlink In-Maroondah Ramp Of — Planned Roadworks

Eastlink In-Maroondah Ramp Of, Ringwood

Map of Eastlink In-Maroondah Ramp Of — Planned Roadworks and nearby items

Map preview · about 20 KB · © OpenStreetMap

Updated (81 days ago)

Planned disruption — Pending

Impact: Lanes blocked

Direction: All directions

Lanes affected: 4

Expected delay: 0 to 5 min

Speed limit on site: 40

EastLink activities occurring between 17/05/2025 and 30/11/2026 during the following times: Weekends 7:00 PM to 7:00 AM. Impact to traffic will be lanes closed multiple directions. Altered speed limit during operation will be 40 and the traffic delay is expected to be 0 to 5 min.

Scheduled from: 17 May 2025, 12:00 am AEST

Scheduled until: 30 Nov 2026, 12:00 am AEDT

Saturday: from 7:00 PM Melbourne time; check VicTraffic for finishing times

Sunday: from 7:00 PM Melbourne time; check VicTraffic for finishing times

Location
-37.8204, 145.2168
Source
State Government of Victoria — Department of Transport and Planning (adapted), CC BY 4.0  · Attribution

OpenStreetMap Open on the full interactive mapVictoria warnings

Nearby

  1. Scheduled roadwork50 m away

    Eastlink — Planned Roadworks

    Details

  2. Scheduled roadwork61 m away

    Maroondah-Eastlink Out Ramp On — Planned Roadworks

    Details

  3. Scheduled roadwork105 m away

    Eastlink — Planned Roadworks

    Details

  4. Scheduled roadwork333 m away

    Maroondah Highway — Planned Roadworks

    Details

  5. Scheduled roadwork337 m away

    Maroondah Highway — Planned Roadworks

    Details

  6. Scheduled roadwork344 m away

    Maroondah-Eastlink Out Ramp On — Planned Roadworks

    Details

  7. Scheduled roadwork346 m away

    Maroondah Highway — Planned Roadworks

    Details

  8. Scheduled roadwork359 m away

    Hillcrest Avenue — Planned Roadworks

    Details

  9. Scheduled roadwork374 m away

    Eastlink — Planned Roadworks

    Details

  10. Scheduled roadwork459 m away

    Maroondah-Ringwood Out Ramp On — Planned Roadworks

    Details