Scheduled roadwork · Pending
Mullum Mullum Tunnel — Planned Roadworks
Mullum Mullum Tunnel, Donvale

Map preview · about 20 KB · © OpenStreetMap
Updated (85 days ago)
Planned disruption — Pending
Impact: Lanes blocked
Direction: All directions
Lanes affected: 4
Expected delay: 0 to 5 min
Speed limit on site: 40
EastLink activities occurring between 17/05/2025 and 30/11/2026 during the following times: Weekends 7:00 PM to 7:00 AM. Impact to traffic will be lanes closed multiple directions. Altered speed limit during operation will be 40 and the traffic delay is expected to be 0 to 5 min.
Scheduled from: 17 May 2025, 12:00 am AEST
Scheduled until: 30 Nov 2026, 12:00 am AEDT
Saturday: from 7:00 PM Melbourne time; check VicTraffic for finishing times
Sunday: from 7:00 PM Melbourne time; check VicTraffic for finishing times
- Location
- -37.8047, 145.2044
- Source
- State Government of Victoria — Department of Transport and Planning (adapted), CC BY 4.0 · Attribution
OpenStreetMap Open on the full interactive mapVictoria warnings
Nearby
Scheduled roadwork745 m away
Scheduled roadwork764 m away
Scheduled roadwork1.4 km away
Scheduled roadwork1.4 km away
Scheduled roadwork1.4 km away
Scheduled roadwork1.4 km away
Scheduled roadwork1.5 km away
Scheduled roadwork1.5 km away
Scheduled roadwork1.5 km away
Scheduled roadwork1.5 km away