Scheduled roadwork
Guildford Rd And Tonkin Hwy, Bayswater - Resurfacing 11pm To 5am
Guildford Rd — Bayswater

Map preview · about 20 KB · © OpenStreetMap
Roads · Power outages
Works: Guildford Rd and Tonkin Hwy, Bayswater - Resurfacing
11pm to 5am
Work type: Resurfacing
Traffic impact: Various closures, detour and speed reduction in place
Starts (AWST): 01/12/2026 23:00:00
Estimated completion (AWST): 02/12/2026 05:00:00
- Location
- -31.9208, 115.9265
- Source
- The Commissioner of Main Roads is the creator and owner of the data and Licenced Material, which is accessed pursuant to a Creative Commons (Attribution) Licence, which has a disclaimer of warranties and limitation of liability. CC BY 4.0. Adapted to canonical Items.
OpenStreetMap Open on the full interactive mapWestern Australia warnings
Nearby
Planned outage839 m away
Scheduled roadwork1.5 km away
Guildford Rd At Fisher St, Bassendean - Maintenance 7pm To 5am
Scheduled roadwork1.5 km away
Guildford Rd At Crowther St, Bayswater - Maintenance 7am To 5pm
Scheduled roadwork1.7 km away
Guildford Rd At Garratt Rd, Bayswater - Maintenance 10pm To 5am
Scheduled roadwork1.7 km away
Tonkin Hwy Southbound Exit To Collier Rd, Bayswater - Maintenance
Scheduled roadwork2.7 km away
Guildford Rd At Old Perth Rd, Bassendean - Maintenance 7pm To 5am
Planned outage2.9 km away
Scheduled roadwork3.4 km away
Scheduled roadwork3.5 km away
Tonkin Hwy Between Benara Rd And Dunreath Dr - Maintenance 8:30pm-5am
Scheduled roadwork4.3 km away
Great Eastern Hwy Between Kooyong Rd And Graham Farmer Fwy, Rivervale - Maintenance 10pm-5am