Scheduled roadwork
Railway/Tram Crossing — Main Road, Blackwood
Main Road Near Murray St, Blackwood

Map preview · about 20 KB · © OpenStreetMap
Roads · Power outages
Type: Roadworks
Work: Railway/Tram Crossing
Location: Main Road near Murray St, Blackwood
Direction: Both Directions
Lanes: No lanes closed
Speed limit: 40 km/h
Starts: 3 Jan 2026, 7:30 pm ACDT
Ends: 28 Nov 2026, 2:30 am ACDT
Job number: 2059271
- Location
- -35.0229, 138.6191
- Source
- Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution
OpenStreetMap Open on the full interactive mapSouth Australia warnings
Nearby
Scheduled roadwork0 m away
Scheduled roadwork183 m away
Scheduled roadwork272 m away
Scheduled roadwork272 m away
Scheduled roadwork438 m away
Kerbing And Footpath Installation — Shepherds Hill Road, Blackwood
Scheduled roadwork465 m away
Scheduled roadwork626 m away
Scheduled roadwork865 m away
Planned outage886 m away
Scheduled roadwork1.0 km away