Scheduled roadwork
Kerbing And Footpath Installation — Shepherds Hill Road, Blackwood
Shepherds Hill Road Near Brighton Pde, Blackwood

Map preview · about 20 KB · © OpenStreetMap
Roads · Power outages
Type: Roadworks
Work: Kerbing And Footpath Installation
Location: Shepherds Hill Road near Brighton Pde, Blackwood
Direction: East Bound
Lanes: One lane closed
Speed limit: 40 km/h
Starts: 26 Oct 2026, 7:30 pm ACDT
Ends: 26 Nov 2026, 1:30 am ACDT
Job number: 2173066
- Location
- -35.0213, 138.6147
- Source
- Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution
OpenStreetMap Open on the full interactive mapSouth Australia warnings
Nearby
Scheduled roadwork206 m away
Scheduled roadwork206 m away
Scheduled roadwork206 m away
Scheduled roadwork438 m away
Scheduled roadwork438 m away
Scheduled roadwork538 m away
Scheduled roadwork621 m away
Scheduled roadwork621 m away
Planned outage670 m away
Scheduled roadwork729 m away