Scheduled roadwork
Excavation Works — Eighteenth Street, Renmark
Eighteenth Street Near Para St, Renmark

Map preview · about 20 KB · © OpenStreetMap
Roads · Power outages
Type: Roadworks
Work: Excavation Works
Location: Eighteenth Street near Para St, Renmark
Direction: Both Directions
Lanes: Shuttle Flow
Speed limit: 40 km/h
Starts: 21 Oct 2026, 5:30 pm ACDT
Ends: 4 Nov 2026, 3:30 am ACDT
Job number: 2172872
- Location
- -34.1768, 140.7471
- Source
- Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution
OpenStreetMap Open on the full interactive mapSouth Australia warnings
Nearby
Scheduled roadwork780 m away
Scheduled roadwork3.3 km away
Planned outage3.5 km away
Planned outage3.6 km away
Planned outage3.8 km away
Planned outage4.2 km away
Planned outage5.0 km away
Planned outage5.9 km away
Planned outage7.4 km away
Planned outage8.5 km away