Skip to main content

Life-threatening emergency? Call Triple Zero (000). · SES flood and storm help: 132 500

Updated · Reload· Auto-refresh every 5 min· Theme: Auto · Light · Dark

Scheduled roadwork

Excavation Works — Eighteenth Street, Renmark

Eighteenth Street Near Para St, Renmark

Map of Excavation Works — Eighteenth Street, Renmark and nearby items

Map preview · about 20 KB · © OpenStreetMap

Type: Roadworks

Work: Excavation Works

Location: Eighteenth Street near Para St, Renmark

Direction: Both Directions

Lanes: Shuttle Flow

Speed limit: 40 km/h

Starts: 21 Oct 2026, 5:30 pm ACDT

Ends: 4 Nov 2026, 3:30 am ACDT

Job number: 2172872

Location
-34.1768, 140.7471
Source
Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution

OpenStreetMap Open on the full interactive mapSouth Australia warnings

Nearby

  1. Scheduled roadwork780 m away

    Excavation Works — Ral Ral Avenue, Renmark

    Details

  2. Scheduled roadwork3.3 km away

    Excavation Works — Sturt Highway, Paringa

    Details

  3. Scheduled roadwork9.4 km away

    Bitumen — Sturt Highway, Monash

    Details