Scheduled roadwork
Excavation Works — Sturt Highway, Paringa
Sturt Highway Near Murtho Rd, Paringa

Map preview · about 20 KB · © OpenStreetMap
Roads · Power outages
Type: Roadworks
Work: Excavation Works
Location: Sturt Highway near Murtho Rd, Paringa
Direction: Both Directions
Lanes: Shuttle Flow
Speed limit: 40 km/h
Starts: 21 Oct 2026, 5:30 pm ACDT
Ends: 17 Nov 2026, 3:30 am ACDT
Job number: 2172872
- Location
- -34.1811, 140.7830
- Source
- Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution
OpenStreetMap Open on the full interactive mapSouth Australia warnings
Nearby
Planned outage334 m away
Planned outage1.9 km away
Scheduled roadwork3.3 km away
Scheduled roadwork3.4 km away
Planned outage6.3 km away
Planned outage6.6 km away
Planned outage7.0 km away
Planned outage8.8 km away