Scheduled roadwork
Tdu - Asset Repair Works — Piccadilly Road, Piccadilly
Piccadilly Road Near Swamp Rd, Piccadilly

Map preview · about 20 KB · © OpenStreetMap
Roads · Power outages
Type: Roadworks
Work: Tdu - Asset Repair Works
Location: Piccadilly Road near Swamp Rd, Piccadilly
Direction: Both Directions
Lanes: Shuttle Flow
Speed limit: 40 km/h
Starts: 12 Nov 2026, 7:30 pm ACDT
Ends: 13 Nov 2026, 2:30 am ACDT
Job number: 2173470
- Location
- -34.9721, 138.7323
- Source
- Data © Government of South Australia (Department for Infrastructure and Transport). Refer to traffic.sa.gov.au for current conditions. · Attribution
OpenStreetMap Open on the full interactive mapSouth Australia warnings
Nearby
Scheduled roadwork240 m away
Scheduled roadwork250 m away
Scheduled roadwork780 m away
Planned outage1.2 km away
Scheduled roadwork1.2 km away
Scheduled roadwork1.4 km away
Scheduled roadwork1.4 km away
Scheduled roadwork1.4 km away
Scheduled roadwork1.4 km away
Scheduled roadwork1.5 km away